Hi. I thought I would ask in the NSX forum even though it is not NSX related, but is an issue from the NSX validated design.
We have our Management network on a VDS Ephemeral port, per the Validate design. So we have our vCenter’s and PSC’s on this port group.
I notice if I power off one of the appliances, and power it back on it will not get network until I disconnect the VM vNic and reconnect it.
Is this a bug somewhere? I want to move just the management portion back to Standard switches, but we want to adhere to the Validated Design.
This caught me off-guard when I powered off a PSC to snapshot it before an upgrade, and it didn’t come back on the network and of course vCenter was not accessible, so I had to login to ESXi host and disconnect. I was about to repoint vCenter to another PSC, but tried this first.
Just curious why this behavior with Ephemeral port. Thanks,,,