Hi,
I could be missing something simple here, is there a way to change the date format away from US standard in the iaas portal (on the requested screen & the details screen). I have the correct date format/region on the iaas server and within iis, same on the vcac appliance.
Cheers
Thomas
I have had the same problem, I don't believe it's possible in 6.0.1.
Just following up on this to see if there is a solution for vRealize 6.2.1?
We would like to change the date from mm/dd/yyyy to dd/mm/yyyy or yyyy/mm/dd
Thanks
So I've done extensive searching but haven't found a solution, and with the silence in the forums, I'm making the assumption that it is not possible to set change the date format to dd/mm/yyyy or yyyy/mm/dd in vRealize Automation version 6.2.x
I would like to have this as feature request then. Please allow the user/administrator to specify their preferred date format.