Hi everyone,
I found differences between what reports vRrealize Operations Manager and vCenter server in the metric "CPU Ready"
For example:
Server1 CPU Ready in vCenter Server:
Server1 CPU Ready in vROP:
vCenter server report 200000 ms average in the last week in CPU ready metric, however vROP report max 12573 ms.
Why is this difference? I'm wrong in how to generate reports?
Thanks
Juan Pablo.