Hi !
Severals ESX Server 3.0.1
VM - win2k, win2k3
Backup server - win2k3
I made backup VM using cron activated sript. The script calls vcbMounter. Backups are done on mounted SMB share folder.
I always get the error - in Virtual Infrastructure Client as the last snapshot appears VCB-BACKUP, and on SMB a disk files (backup is made not completely) are copied not all.
How can I organize VCB Backup on Backup server?
How can I organize VCB Backup for Oracle and MS SQL?
Thanks.
Hello,
You use vcbMounter from a cron script running on your ESX Server?
When the backup finishes it should automatically delete the delta it creates. If it is not it may not be finished by the time the next backup is ready to run.
Use of SMB as the backup medium is not suggested as it has performance issues at this moment. VMware is aware of these. Using SMB will guarranttee that the backup is not finished before the next one starts. I would copying the backup to a local drive then compressing it and copying that over the wire. Or using something like VizionCore's vRanger product which can backup over the network quickly.
Best regards,
Edward L. Haletky, author of the forthcoming 'VMWare ESX Server in the Enterprise: Planning and Securing Virtualization Servers', publishing January 2008, (c) 2008 Pearson Education.
Try upgrading to ESX 3.0.2, VC 2.0.2 and VCB 1.0.3. VMware addressed bugs in previous releases of VCB.
JWC
I made upgrade ESX 3.0.1 to 3.0.2 by esxupdate -n update. After that vcbBackup began to work more slowly approximately in 10 times!
Did you upgrade to VCB 1.0.3 and Virtual Center 2.0.2 also?
No. I did't upgrade to VCB 1.0.3, because i don't use VMware Consolidated Backup. I use Service Console to Back Up and Restore Virtual Machines (vcbMounter). And i don't use Virtual Center to.
Thanks
On vcbMounter backup on SMB share (VM : win2k3, 3 logical disks in total volume 50 GB) 1.5 hours leave approximately. It is normal?