I am trying to determine the length of time the report uses to determine if a machine is oversized. Meaning is it a point in time (the point when I run the report) or is it over a week, month, lifetime?
Hi,
I wrote a blog on this : http://www.virtualclouds.co.za/?p=51
Let me know if you need more info.