Hi,
Have anyone sucessfully implement esx 3.5 based on the following BOM.
I'm wondering if IP Address is required for the following to be configured?
I have 6 Cisco switch, how will the connection look like physical. Anyone can porvide some insight on this and how does Mult-siwtch Interconnect module and cisco switch intergrate.
a)IBM BladeCenter Cisco Catalyst Switch Module 3012 (May08)
b) Multi-switch Interconnect Module for IBM BladeCenter
IBM BladeCenter H 2900W AC Power Module Pair with Fan Packs 1
IBM BladeCenter Advanced Management Module 2
IBM BladeCenter H Triple IEC 320 C20 (200-240V) 2.8M 2
IBM BladeCenter Optical Passthru Module 2
IBM BladeCenter Optical Passthru Module LC Cable 8
IBM BladeCenter Cisco Catalyst Switch Module 3012 (May08) 6
Multi-switch Interconnect Module for IBM BladeCenter 2
DPI 32amp/250V Front-end PDU with IEC 309 2P+Gnd 2
Warranty uplift: 3 Y P, L, O/S, 2Hr, 24x7 1
HS21XM Blade Servers (2* 3.0GHz QC CPU, 16 GB RAM, 6x NIC, 2xHBA)
HS21 Xtended, Intel Xeon Quad Core E5450 3.0GHz/1333MHz, 2x6MB L2, 2x512MB Chipkill, O/Bay 2.5" NHS SAS 4
Quad-Core Intel Xeon Processor E5450 3.0GHz/1333Mhz, 12MB L2 4
IBM 8GB (2 x 4GB Kit) Chipkill PC2-5300 CL5 ECC DDR2 SDRAM FBDIMM 667MHz (Dual Rank) 8
IBM BladeCenter QLogic Ethernet and 4Gb Fibre Channel Expansion Card (CFFh) 4
IBM BladeCenter (CFFv) Ethernet Expansion Card 4
IBM Dual 15.8 GB 2.5" Solid State Drive (SATA) 4