Hi.
I have been asked to give a estimation about how log would an upgrade take. I have never updated from 3.0 to 3.5 so I ignorehow long it is,
It is one VC and 30 ESX (some 3.0.1 some 3.0.2) plus 30 new ones. All the new ones would be from scratch and I think that 30 old ones would be scratched too, not upgrade.
Can anybody say me how long would take to install one server from scratch using a scripted installation? 3 hours?
Best regards.
Complete install from scratch - 15 to 20 min with a tea break.
With or without milk?
Thanl you for your comment.
Takes longer to install Windows 2003 Server - need a lunch break for that !