Almost 2 years ago, we utilized SRM to move our datacenter to a colocation in order to minimize downtime. So basically, we replicated our environment (3 vSphere 4.0 Hosts and 1 Dell EqualLogic PS6000E SAN) and failed over to the colo site. Now, I will be starting a DR project to set up SRM in another location using the equipment we had from our original datacenter. There are few changes in our enviroment since we moved to the colo so my question is, should I really start from scratch as far as setting up the hosts and vcenter for the DR location? I am thinking that I just need to update the network configuration of the hosts and vcenter then I am good to go. Any advice will be greatly appreciated.