hi,
kindly give a solution of How can we add New Windows Domain after removal of old domain from VM View 4.0 (VCenter).
Currently we are using test.local for authentication now comapany has implemented all over branch in same domain so we need to add those thine client machine to new domain .
any one give a solution it's very usefull for me to complete my job.
Kindly Check the attached file also
Thanks in advance.
You might want to ask a moderator to move this post into the View areas of the forum, or post this question directly there instead of here in the VCP area.
Scott.
thread moved from VCP: VMware Certified Professional to VMware View™ (with View Manager)
You can try below procedure
Assume, OldVdi currently member of OldDomain, Now you have NewDomain in-place to migrate. You also have linked clone pools defined which is part of OldDomain
Now try out these steps
Hi SKG,
Thanks for prompt reply,
we will check and reply .
Thanks
Kesavan K M
Hi SGK,
Is there any documents for follow your steps.
Already we are created one way trust between domains for file share access, some of the laptop users in old domain to new domain migration file share not accessed then only we created one way trust. And we don't want to list 2 domain name in log on windows.
Give me any document link for which you sugestted.
Regards,
Kesavan K M
The proceedure I have suggested is a try-out method. No where docuemented.
You can unlist multiple domains listed in view-logons. Check View administration guide - vdmadmin commands for "Domain blacklisting"
And more over the trust I have suggested is temporary , so as it will enable migration. Once it is into new domain, you can decommision the old connection server
Any reason why you can't just do a swing migration? Meaning build a new pool of machines on the new domain. Use hte same master image you used from the old domain and they jsut have the users connect to the new pool? If you do it right no one would even know it happened. If you are using Persistant disks then this obviously wouldn't work. In that case I'd just manually move those VMs to the new domain (there are only 58) and change the domain settings in View Configuration.
As far has how to handle hte client side (the terminals) that should be centrally managed if you are using Wyse or HP terminals, so that should be cake.
Gunnar