VMware Cloud Community
sphar
Contributor
Contributor

Poor man's capacity planning using HP ProLiant server sizer

Hi all,

I am starting the journey of sizing approximately 30 HP Proliant DL360's and DL380's to a VMWare optimized solution (sizer is HP ProLiant server sizer for VMware ESX Server)

Workload is AD, Exchange, IIS, SQL, Oracle, System Center OpsMan/ConfigMgr

How does one calculate Avg/Max Disk IOPS and Avg/Max Network Throughput so I can ensure correct sizing based on HP .xls sizer worksheet?

I'm going to use the following perfmon counters and running counter logging for approximately 2 weeks on the above Servers.

Avg CPU Utilization (%)

Peak CPU Utilization (%)

Processor\%Processor Time\_Total

Avg RAM Usage (MB)

Peak RAM Usage (MB)

Memory Available Mbytes then subtract amount of RAM.

Avg Disk Throughput (IOPS)

Peak Disk Throughput (IOPS)

PhysicalDisk\Disk Bytes/sec\_Total

Avg Network Throughput (MBps)

Peak Network Throughput (MBps)

Network Interface\Bytes Total/sec

Thanks to all who read/reply/offer advice.

Reply
0 Kudos
1 Reply
mreferre
Champion
Champion

This is the shortcut I usually take:

http://it20.info/blogs/main/archive/2007/11/26/83.aspx

Massimo.

Massimo Re Ferre' VMware vCloud Architect twitter.com/mreferre www.it20.info
Reply
0 Kudos