I used evaluation license in some days to ensure that my system working fine. Today, I active my license and use it but i failed. My details are here:
- 4 blade servers bl460c Gen8 with 2 CPUs, 8 cores per CPU and Hyperthreading enabled.
- I have 8 OEM licenses of vSphere (VMw vSphere Std 1P 1yr)
- I already get Licence Key from HP, then i active it and get Activation Code from VMware. It's look like simple
- But when i enter this activation code into my ESXi server, error appear (http://img507.imageshack.us/img507/1518/4w49.png)
I understand that activation code is only for 1 CPU. But i have thought i have to enter 2 activation codes to my ESXi server to enable 2 CPUs (and supporters of HP said the same). I didn't know only one activation code will be enter. Do i buy other license key? Does it have some way to use my OEM license?
All products and license was bought through HP in a project.
You need to combine the licenses in the license portal.
The error comes up since you are trying to add a 1 cpu license to a 2 cpu machine.
On another note, it does seem that you do not have enough licenses for your hosts since you have 4 hosts with 2 cpu:s in each = 8 licenses.
(Assuming that HP is selling 1cpu licenses)
// Linjo
You need to combine the licenses in the license portal.
The error comes up since you are trying to add a 1 cpu license to a 2 cpu machine.
On another note, it does seem that you do not have enough licenses for your hosts since you have 4 hosts with 2 cpu:s in each = 8 licenses.
(Assuming that HP is selling 1cpu licenses)
// Linjo
I already had 8 OEM licenses from HP which help me get 8 activation codes from VMware. You save my life when tell me about "combine licenses" and "license portal".
I'm try it now...
Big thank, my hero!
P/S: If i successful in combine 2 license, i will use new license tomorow, then i will tell you it work or not. Thanks!