I have two dedicated physical nicks used for Management traffic on each of our ESXi hosts.
We are setting up VVOL and use Veeam to backup all vm´s.
When using VVOL, backup is done through the management interface (2x1Gb/s).
Now, all traffic is going through only on cable (1Gb/s).
We would like to have load balanced the two physical cables, so the load is distributed over both cables.
vSwitch0 is dedicated to Management traffic.
How do we do that?