gilpena
Contributor
Contributor

VCF 4.0.0.0 workload domain upgrades

I will be using SDDC Manager (4.0.0.0) to upgrade to VCF 4.2 and have several questions:

1. Are  workload domains upgraded sequentially, or can they be upgraded in parallel?

2. I have two workload domains. The first WLD(1) has NSX-T Managers and Edge Nodes. The second WLD(2) has been configured to use the NSX-T Managers and Edge Nodes in WLD(1). Do I have to upgrade WLD(1) before I can upgrade WLD(2)?

thanks,

0 Kudos
0 Replies