I have no issue using converter 5 until I kick off a second task/job. It fails at about 10% with a
FAILED: An error occurred during the conversion:
'The operation experienced a network error'
However, if I wait until my 1st job is finished then kick off this second job it finishes with no issues? Am I missing a conifg somewhere? I know in the past with previous version os Converter I could have multiple conversions running at the same time with no issue.
Thanks!!!!
Could you attach some logs with failed conversion? This is abnormal situation, simultaneous jobs are fine, you should check your network configuration as well.
The error I see is a network error:
FAILED: An error occurred during the conversion:
'The operation experienced a network error'
What can I check? I have never had an issue with this before, this is new in converter 5.0.1
I can do one by one with no issues, and once the current copy finishes I can kick off the same one that just errored out and it completes fine.
Thanks for your help!!
There must be more detailed error information even at default log level.
I never hear about such problem, so this should be something in your network
Check for SSL encrypted transfer in this thread http://communities.vmware.com/thread/333786?start=0&tstart=0 this could help you.
If you want to schedule your conversions try to change 'Maximum Concurent tasks' to 1 and tasks will be executed one by one.
HTH
Thanks for your reply.
I checked out the thread and made the SSL change which increased my conversion speed GREATLY! Thanks so much for that.
However, I am still seeing the network error when I try and convert more then one at a time.
If it was a network issue I would think all conversions would fail....
Any idea what I could check? Which log would be helpful to you?