I need to schedule a report to be generated the last day of each month. I only see "the last sunday/monday/etc day of the month" or the 31th day of the month and to run it every 1 month. I do not think this will do.
Any suggestions?
Hi
I do see the same in scheduling the reports.
it has an option of generating/scheduling for 31st day of every month.
regards
Gayathri
Hi, GayathriS.
Thx for your response. My doubt is what happens exactly with the months that have less than 31 days? The report will be generated the last day of the month or it will do it 31 days after the last generated report?