What risks are there to my ESXi cluster by performing a storage system upgrade such as on a VNX and how serious are the risks (i.e. temporary loss of connectivity during path failover to secondary controller, performance degredation, etc.)? I am using Fibre Channel and I need to upgrade the OE operating system software on my VNX.
If zoning is configured properly (i.e. paths to SPA and SPB) ESXi you should not really notice an interruption but simply switch the paths to the LUN(s). If you are running very high workloads, you should consider to upgrade during non-peak hours (the pre-upgrade check will determine CPU load on the SPs and warn you if it's too high for an upgrade). I just upgraded a few VNX5400 Unified systems and it took about 3 hours for the file and block OE upgrade.
André
If zoning is configured properly (i.e. paths to SPA and SPB) ESXi you should not really notice an interruption but simply switch the paths to the LUN(s). If you are running very high workloads, you should consider to upgrade during non-peak hours (the pre-upgrade check will determine CPU load on the SPs and warn you if it's too high for an upgrade). I just upgraded a few VNX5400 Unified systems and it took about 3 hours for the file and block OE upgrade.
André
Correct. I do it all the time. You should not see outages at all.
Thanks!