Hi all,
Has anyone seen this, This issue has followed us from 4.1 to 5 all hosts have been upgraded to esxi5 also.
I thought at first it was a powercli issue as a script that get run was showing greater than 100% for both memory and cpu at the cluster level, after finally having a look at the script there was errors but there was still the odd max usage over 100%
checking in vcenter it also shows these greater than 100% see attched screenshot of cpu
has anyone seen this before?
Cheers
________________________________________
Blog: http://virtualiseme.net.au
VCDX #201
Author of Mastering vRealize Operations Manager