Hi Everyone
I am just asking for a bit of advice on upgrade scenarios.
I have a pair of 3.1 view servers I need to upgrade to 4.6 It isn't just as simple as that. I need to migrate them to 2 new W2K8 64 bit machines also.
The config for the 3.1 is a load balanced pair. However each of the load balanced pair is 32bit and has 1 VCPU and 3 GB RAM.
There are a couple of ways to do it I susupect. The way I am thinking of doing it is this (ensuring a good backup!):
0) Remove one server from load balancer
1) Upgrade one of the 32 bit servers VCPUs to 2
2) In place upgrade of a singular host from the pair to 4.6
3) Add in a replica server (on both new 64 bit machines)
4) Add hosts into load balancer
5) Remove 32 bit hosts
6) Test
Cheers
Stu